Glossary: the terms, in plain words.
What do these words mean here?
AI basics
- AI tools
- actions an AI agent can run through a connector.
- Skills
- packaged instructions that teach an AI agent to do one job well.
- Agents
- AI workers that chain tools and skills to finish a task end to end.
- Connectors
- MCP servers that plug a product into Claude and other AI clients.
- AI solutions
- tools, skills and agents shipped, added up.
Marketing Mix Modeling
- Baseline
- What would have sold with no paid media at all: the brand, the distribution, the price, the habit.
Why it matters.
It is usually the larger part of the business, and no advertising figure describes it. Every return on this site talks only about the part media moved, which is the smaller one and the one you buy.
- Incremental
- The part of the outcome that would not have happened without the advertising, separated from the part that would have happened anyway.
Why it matters.
A platform reports the conversions it touched. A model reports the ones it caused. The gap between the two is the whole reason to build one.
- ROAS
- What a channel returned for every unit of spend put into it, across the whole period, averaged over all of it.
Why it matters.
It reads the money already spent. It says nothing about the next unit of spend, and reading it as though it did is how budget ends up in a channel that stopped paying a long time ago.
- Marginal ROAS
- What the NEXT unit of spend would return in a channel, at the level that channel is running today.
Why it matters.
It is the only one of the two that answers a budget question. A channel can have a strong average return and a marginal one already below what your margin needs.
- Break-even
- The return each unit of spend has to bring back to pay for itself at your gross margin, which is one divided by that margin.
Why it matters.
The bar is not one. At a 42% margin each unit of spend has to bring back about 2.38 to break even, so a channel returning 1.50 is losing money while looking profitable.
- Adstock
- The way an impression keeps working after the week it landed, spread over the weeks that follow instead of all falling on one.
Why it matters.
It is why a television campaign is not judged by the week it aired. Without it, every slow-building channel looks worse than it is and every immediate one looks better.
- Half-life
- The week by which half of a channel's effect has already happened, read off its decay curve.
Why it matters.
It says how far ahead of a result you have to spend. A channel with a half-life of six weeks cannot rescue a quarter that ends in three.
- Saturation
- How full a channel is against its own ceiling: how close it already runs to the point where more money stops adding much.
Why it matters.
It is where the room to grow is. Two channels with the same return are not the same bet if one of them is nearly full.
- Where the evidence ends
- The spend up to which a response curve is measurement. Above it, the plan is asking a channel for more than that channel ever had, and the curve becomes the shape of the model carried forward.
Why it matters.
It is the line between what the data saw and what the model assumes. A plan that crosses it is not wrong, but it is a bet rather than a reading, and the chart draws it dotted for exactly that reason.
- Calibration
- Which of the model's figures your own data moved, and which kept the values the library started them at.
Why it matters.
A figure your data moved is evidence. One that kept its starting value is an assumption wearing the same clothes, and only one of the two is worth arguing with in a meeting.
- R-hat
- A check that the model's separate sampling runs landed in the same place. Near 1 they agreed; above 1.2 they did not.
Why it matters.
If they did not agree, the figures can move between runs. Reading a ranking off a model that has not settled is reading noise.
- Credible interval
- The range the model is prepared to defend for a figure, rather than the single number in the middle of it.
Why it matters.
When two channels have ranges that overlap, the model cannot tell them apart, and putting one above the other in a deck is a claim the model never made.
Chief of Staff
- DRI
- Directly Responsible Individual: the one person accountable for a piece of work.
Why it matters.
Work everybody owns is work nobody owns. On the Chief of Staff board the DRI is always the person who creates or saves the card.
- NOW, NEXT, LATER
- The three horizons of the board: what is being worked now, what comes next, and what can wait.
Why it matters.
Only NOW has a gate, with limits: at most 20 cards per initiative, 10 initiatives and 10 projects.
- Impact/effort ratio
- A card's impact divided by its effort. Each column is ordered by it, highest first, with the unestimated last.
Why it matters.
The most value for the least work goes to the top, and a column that drifted can be put back in order.
- Outcome card
- A card named by what it changes, such as 'Pricing deck → close rate from 22% to 30%', never by the task.
Why it matters.
It says what will be true when it is done, where it stands today and the evidence needed to close it.
- Session
- One working session: it opens from what was left pending and closes with what got done, the decisions and what stays pending.
Why it matters.
What stays pending at the close is what the next session opens with, so tomorrow starts where today ended.
Build
- SDD
- Spec-driven development: the spec and the rules are written before the code, and every change reads them first.
Why it matters.
AI makes building fast. Writing the spec first keeps that speed from turning into rework.
- OpenSpec
- The third-party tool that keeps the living spec and every change as files in the repository, and validates them.
Why it matters.
No change reaches dev unless the specs and changes pass its strict validation.
- Spec
- The living description of what a capability must do: its purpose, its requirements and their scenarios.
Why it matters.
It is what a change is planned from and what Verify checks against.
- Constitution
- The 12 principles every change follows, approved by Lu on 28 Sep 2026, such as 'zero invented data' and 'the machine checks, Lu judges'.
Why it matters.
Every change reads it before planning, so the rules do not depend on who is building.
- Change
- A group of up to 10 cards of one initiative, planned together and taken through the phases: plan, build, verify, ship, measure and close.
Why it matters.
A small batch closes in days, and each phase has its own prompt to follow.
- Definition of Done
- The checklist on a card, one box per line, that says when the card is finished.
Why it matters.
A card without one is refused: done is something a third person can check.
- AI QA
- The first quality gate: the AI checks what was built, one check per Definition of Done item, each with its evidence.
Why it matters.
The machine checks everything a machine can, before a person spends time on it.
- Human QA
- The second quality gate: a recipe of numbered steps a person follows on the real product, for what only a person can judge.
Why it matters.
A card reaches it only when its recipe exists, and only the person moves it to Done.